(January 2015 – November 2015)
MAKS Engineers worked as sub-consultant on performing the Post-tensioning inspection for the post-Tensioning operation. The post-tensioning operation was based on the details provided by the Structure Drawings and the Shop drawings provided by VStructual LLC.
The Post-Tensioning Inspection was performed by MAKS as per the FHWA Post-Tensioning Tendon Installation and Grouting Manual, and the PTI Post-Tensioning Manual.
During the inspection, MAKS was collecting all required information and kept a record of the tensioning procedure; providing engineering solutions during operation; preparing the stressing table based on the data recorded during inspection; provided engineering calculations for the stress, elongation, friction loss and etc.
MAKS also helped PKF on providing engineering consulting services for the tendon lift-off test, tendon detention and replacement; provided engineering supporting for the pier 2 strength capacity calculation and safety redundancy check under different construction stages. Provided Construction support services, design of temporary support structure to support the excavation for abutments and piers.
We would love to hear from you! Fill out the form below and our experienced team will provide you with exceptional engineering services tailored to your needs.