(April 2020 – March 2021)
MAKS provided the construction inspection for the Pavement Preservation project to extend the service life of Route 195 EB from Hobson Avenue to CR 526. The project scope included but was not limited to the construction inspection of pavement preservation by application of High-Performance Think Overlay Course (HPTO) on the main line, application of chip seal surface overlay at ramps; micro-milling was done on approaches to bridge structures, on approaches to ramps and around drainage inlets; repair to deep defects with Hot Mix Asphalt, inlet filters installation and resetting, Weigh in Motion (WIM) devices were installed, Line/marking removal, temporary striping, RPM removal, turf stabilization, topsoil stabilization, curbs, permanent epoxy traffic stripes, rumble stripes and RPM installation.